Operational 2026
Mets Masrik

This power plant operates in the open market.

Mets Masrik
Mets Masrik
Operational 2026
Mets Masrik

This power plant operates in the open market.

  • Total Capacity: 5.5 MW
  • Panel Technology: Bifacial
  • Annual Generation: 9,000 MWh
  • Homes Powered: ∼3,300
  • Annual CO₂ Savings: 3,900 tons
  • Commissioned: Q1, 2026
  • Land Area: 6.0 hectares
  • Location: Mets Masrik, Gegharkunik
map
Explore other Solis Group solar stations
Operational 2025
Sunergy

Located on a total area of 7.5 ha, this power plant operates in the open market.

  • Status: Operational
  • Capacity: 5.5 MW
  • Annual Generation: 9,000 MWh
  • Annual CO₂ Savings: 3,900 tons
  • Location: Garni, Kotayk
Sunergy
Operational 2020
Solar Farm-1

Located on a total area of 10.0 ha, this power plant operates under the feed-in tariff scheme with a guaranteed power purchase agreement until 2040.

  • Status: Operational
  • Capacity: 5.9 MW
  • Annual Generation: 9,500 MWh
  • Annual CO₂ Savings: 4,150 tons
  • Location: Aghberk, Gegharkunik
Solar Farm-1
Operational 2022
Enteria

Located on a total area of 2.5 ha, this power plant operates under the feed-in tariff scheme with a guaranteed power purchase agreement until 2040.

  • Status: Operational
  • Capacity: 2.2 MW
  • Annual Generation: 3,400 MWh
  • Annual CO₂ Savings: 1,500 tons
  • Location: Shoghakat, Gegharkunik
Enteria
Reliable. Renewable